Understanding Pre‑Construction Services

Harrison Construction specializes in pre‑construction planning, a phase that determines feasibility before any physical work begins. The firm’s scope includes due diligence, conceptual estimating from early drawings, value‑engineering alternatives, constructability reviews, development scheduling, subcontractor qualification, bidding assistance, and permitting coordination. By delivering a detailed picture of cost, schedule and risk early, the company helps tenants, franchisees, developers and architects make informed decisions before signing leases or contracts. This foundation sets expectations for the estimate request that follows.

Gathering Core Project Information

The first step in a request is to provide a dated set of drawings that reflect the current design intent, even if they are schematic. Include the intended use of the space—restaurant, medical office, retail, etc.—and a concise list of known site conditions such as existing utilities, structural constraints, or environmental hazards. Supplying the lease agreement or tenant improvement allowance language clarifies financial parameters. A clear statement of the projected opening date allows the estimator to align construction sequencing with market timing.

Documenting Assumptions and Triggers

An assumptions sheet should accompany every estimate version. This document records the date, the source of each assumption, and the rationale behind cost factors like material pricing, labor rates or code requirements. It also identifies decision points that will trigger an updated estimate, such as finalizing HVAC system selections or confirming a façade material. By maintaining this sheet, owners can trace why a figure changed when the design team revises the scope, reducing disputes and keeping the project on schedule.

Separating Allowances, Exclusions and Owner‑Supplied Items

Ask the estimator to break down the estimate into three distinct categories. Allowances cover items that are not fully defined, such as specialty equipment or finish selections, and are presented as budget ranges. Exclusions list work that will not be performed by the contractor, like tenant‑owned furniture or external landscaping. Owner‑supplied items identify equipment or systems the owner intends to provide, ensuring the contractor does not double‑count costs. This separation creates transparency and simplifies later change‑order negotiations.

Real‑World Example: A Franchise Kitchen Rollout

A regional fast‑food chain approached Harrison Construction with prototype drawings for a new location in Dallas. The owner supplied the lease, a schematic floor plan, and a list of required kitchen equipment. Harrison’s team performed a site visit, documented existing utilities, and produced a conceptual estimate that isolated the equipment allowance, highlighted the need for a dedicated grease trap, and flagged a potential permitting delay due to fire‑code requirements. The clear assumptions sheet allowed the franchisee to adjust the equipment list before the bid phase, saving both time and money.

Hypothetical Situation One: Medical Office Expansion

Imagine a healthcare provider planning to add a specialty clinic onto an existing office building. The owner sends dated construction documents, a lease amendment, and a list of known constraints, such as a load‑bearing wall and proximity to a medical gas line. The estimator separates the cost of the new HVAC zone as an allowance, lists the removal of the load‑bearing wall as an exclusion (to be handled by a structural engineer), and notes that the provider will supply the imaging equipment. A trigger is set for when the provider finalizes the equipment layout, prompting a revised estimate.

Hypothetical Situation Two: Adaptive Reuse of a Warehouse

Consider a developer converting a 1970s warehouse into a mixed‑use loft with retail on the ground floor. The request includes a site address, a lease, early concept sketches, and a summary of known conditions: existing slab, roof condition, and limited access for large deliveries. Harrison Construction conducts due‑diligence testing, identifies the need for seismic upgrades, and provides a conceptual estimate that separates the seismic retrofit as a separate allowance. The assumptions sheet records the use of a standard concrete reinforcement cost, and a trigger is established for when the architect finalizes the façade material, which will affect the permitting path.

Maintaining a Clear Communication Loop

Throughout the pre‑construction phase, the owner should schedule regular check‑ins with the estimator to review the assumptions sheet and any emerging risks. Email threads, shared cloud folders, or a project‑specific collaboration platform keep all parties aligned. When a design change occurs—such as a shift from a single‑zone HVAC system to a variable‑air‑volume system—the estimator updates the cost model, notes the change in the assumptions sheet, and flags the trigger that prompted the revision. This disciplined approach minimizes surprise cost escalations.

Leveraging Value Engineering

Value engineering is a systematic method to explore lower‑cost alternatives without sacrificing performance. Harrison Construction presents at least two options for each major system, such as a standard fire suppression system versus a water‑mist system, with associated cost differentials and life‑cycle implications. The owner reviews these options alongside the assumptions sheet, selects the preferred path, and the estimator adjusts the allowance or direct cost accordingly. Documenting the decision ensures that later bids reflect the chosen value‑engineered solution.

Preparing for the Bidding Transition

When the conceptual estimate stabilizes, the next step is to move toward a bid. The owner should confirm that all allowances have been either defined or retained, exclusions are finalized, and owner‑supplied items are clearly marked. Harrison Construction then initiates subcontractor qualification, issuing the refined estimate as a basis for bid packages. The transition is smoother when the assumptions sheet is complete, because subcontractors can reference the same data set, reducing ambiguity in pricing.

Permitting Considerations in Dallas‑Fort Worth

Dallas‑Fort Worth municipalities often require early coordination for fire, health, and accessibility codes. By integrating permitting activities into the pre‑construction phase, Harrison Construction can identify potential hurdles—such as a required fire‑rated assembly wall or a mandated parking ratio—before the budget is locked. The owner benefits from a more realistic opening date, as permitting timelines are incorporated into the development schedule and reflected in the assumptions sheet.

Owner’s Role in Supplying Documentation

The owner must ensure that all documentation is current and accurately dated. Lease clauses that affect tenant improvement allowances, existing utility maps, and any prior inspection reports should be included. Failure to provide up‑to‑date information forces the estimator to rely on assumptions, which can later result in change orders. A well‑organized submission package demonstrates professionalism and accelerates the estimator’s ability to produce a reliable conceptual estimate.

Using the Estimate for Decision‑Making

Once the estimate is received, the owner compares it against budget constraints, financing availability, and strategic goals. The breakdown of allowances, exclusions and owner‑supplied items helps isolate areas where cost reductions are possible, such as selecting an alternative flooring material. The assumptions sheet serves as a decision‑support tool, allowing the owner to ask targeted questions—e.g., “What is the cost impact if we shift the opening date by three months?”—and receive data‑driven answers.

Document Retention and Version Control

Every estimate version should be saved with a unique identifier that includes the date and a brief description of the change trigger. The assumptions sheet should be attached to each version, creating a clear audit trail. This practice is especially valuable when multiple stakeholders—owners, architects, lenders—review the project’s financial evolution. It also simplifies the handoff to the construction manager once the bid phase concludes.

Integrating Technology for Accuracy

Modern estimating software allows for real‑time cost updates linked to a centralized assumptions database. Harrison Construction leverages such tools to ensure consistency across all estimate versions. Owners can request a read‑only view of the cost model, providing transparency without compromising proprietary data. When a design change is entered, the software automatically recalculates affected line items, updates the assumptions sheet, and flags any cost overruns for immediate review.

Final Checklist Before Submitting a Request

1. Dated set of schematic drawings or concept sketches. 2. Lease agreement and any improvement allowance language. 3. List of known site conditions and utilities. 4. Intended opening date and critical milestones. 5. Preliminary assumptions sheet outlining cost bases. 6. Clear identification of allowances, exclusions and owner‑supplied items. 7. Contact information for the owner’s decision‑makers and design team. Submitting this package to Harrison Construction streamlines the pre‑construction process and yields a more accurate early estimate.

Next Steps After Receiving the Estimate

Review the estimate line by line, focusing on the assumptions sheet to understand the basis of each figure. Conduct a joint meeting with the estimator to clarify any ambiguous items and to confirm the triggers for future revisions. Decide which value‑engineering options align with project goals, and finalize the list of owner‑supplied items. Once consensus is reached, authorize the transition to the bidding phase, knowing that the cost baseline is well‑documented and mutually understood.

Choosing Between a Ground‑Up Build and an Adaptive Reuse for a New Retail Concept

When a brand evaluates whether to erect a new shell or convert an existing structure, the first concrete decision hinges on the “due‑diligence on the site or the space” stage described in the pre‑construction services. Request a site‑specific due‑diligence report that includes a high‑level cost range for demolition, structural reinforcement, and any required remediation versus the cost of new foundation work and exterior envelope construction. The report should also note any known site conditions—such as soil stability or historic preservation constraints—that could add contingency to either option.

Next, ask the estimator to produce two parallel conceptual estimates, each anchored to the same dated drawing set but reflecting the different scopes. For the adaptive reuse, the estimate must separate “owner‑supplied items” (e.g., existing HVAC units that will be retained) and “allowances” for upgrades (such as a new fire‑suppression system). For the ground‑up build, the estimator should list “exclusions” that would not apply, like demolition or asbestos abatement, and include a separate allowance for the “prototype” interior finish package. This side‑by‑side format lets the owner see where cost drivers diverge and where they overlap.

The practical tradeoff emerges in the “project development schedule” component of each estimate. An adaptive reuse often compresses the overall timeline because the exterior shell already exists, but the schedule may include longer “constructability review” periods to resolve unforeseen conditions hidden within the existing building. Conversely, a ground‑up project may have a longer “permitting with the city and other reviewing authorities” phase due to new footprint approvals, yet it typically yields a more predictable schedule because the design is not constrained by legacy elements. By comparing the two schedules alongside the cost breakdowns, the decision‑maker can weigh the value of a shorter time‑to‑market against the risk of hidden remediation costs.

Why Choose Harrison Construction for Pre‑Construction

Since its founding in 2011, the construction team has built a reputation for thorough due diligence, transparent estimating and proactive schedule development. The firm’s integrated approach—combining site visits, constructability reviews, value‑engineering studies and permitting expertise—provides owners with a single point of contact for all early‑stage decisions. By following the checklist and documentation practices outlined above, owners can maximize the value of the builder’s pre‑construction services and set a solid foundation for project success.

For owners ready to begin, contact the contractor at pre-construction services in Dallas-Fort Worth to schedule a site visit and start the pre‑construction planning process.

✳

A considered edit of the everyday.

About our editorial approach